Verification and modification of the 5D BIM model carried out during bridge construction


openaccess, Vol. 616 (12) 2023 / piątek, 22 grudnia, 2023

(Open Access)

DOI: 10.15199/33.2023.12.13

Krygier Artur, Trochymiak Wojciech. 2023. Verification and modification of the 5D BIM model carried out during bridge construction. Volume 616. Issue 12. Pages 62-66. Article in PDF file

Accepted for publication: 20.11.2023 r.

The main goal of the article is to describe the 5D BIM model of a post-tensioned concrete bridge being part of an expressway on the example of an ongoing construction.Amethod (a pattern) of monitoring of work progress as well as collecting the data (with relevant elements of coding of the collected data) and transferring it to the designers for the purpose of updating the model was developed while verifying the completed construction phases, the time schedule, the usage of materials and resources, including the expenses. The research confirmed incompatibility, also observed elsewhere in the construction sector, between the general contractor’s and the designer’s models . The article contains conclusions and practical examples of introducing the BIM methodology to design and construction of infrastructural objects while accounting for the construction site’s realities.
  1. https://biblus.accasoftware.com/en/what-is-10d-bim/.
  2.  Apollo M, Grzyl B. Aktualny stan wdrożenia BIM w polskich firmach budowlanych. Materiały Budowlane. 2023; 2 (606): 28 – 31.
  3.  Kosiedowski W, Wirkus M. Bariery i ograniczenia wdrażania technologii BIM – wyniki badań pilotażowych. Builder. 2021; 10: 28 – 30.
  4.  MRiT: Cyfryzacja procesu budowlanego w Polsce. Mapa drogowa dla wdrożenia metodyki BIM w zamówieniach publicznych, v. 25.09.2020 [online]. Availabel: www.gov.pl/web/rozwoj-technologia/mapa-drogowadla- wdrozenia-metodyki-bim-w-w-zamowieniach-publicznych.
  5. BIM-M-01 Powiązanie wymagań technicznych dotyczących drogowych obiektów inżynierskich z technologią BIM, MI, v. 01 od 02.03.2021, [Online]. Available: www.gov.pl/web/infrastructura/bim.
  6.  BIM-D-01 Powiązanie wymagań technicznych dotyczących dróg publicznych z technologią BIM. MI, v. 01 od 27.06.2022, [Online].Available: www.gov.pl/web/infrastructura/bim.
  7.  Tomana A. Model projektanta vs. model wykonawcy. Materiały Budowlane. 2020; 2 (570): 50 – 51.
  8.  PORR S.A., SKD-inżynieria SP. z o.o., IVIA S.A.: Projekt Wykonawczy, ObiektMS-35, 2021.
  9.  Trochymiak W, Krygier A, Stachura M, Jaworski J. The BIM 5D model of the bridge built using the incremental launching method. Archives of Civil Engineering. 2023; doi: 10.24425/ace. 2023.146073.
  10.  Krygier A, Stachura M, Mazurek M, Jaworski J, Trochymiak W. Projekt mostu budowanego metodą nasuwania zgodnie z technologią BIM. Seminarium Naukowo-Techniczne WDM – Wyzwania współczesnego mostownictwa. DWE, Wrocław, Poland, 2022: 423 – 434.
  11. https://www.planradar.com/pl/.
mgr inż. Artur Krygier, PORR S.A. ORCID: 0009-0003-1971-5735
dr hab. inż. Wojciech Trochymiak, Politechnika Warszawska, Wydział Inżynierii Lądowej ORCID: 0000-0002-9099-9457

dr hab. inż. Wojciech Trochymiak, Politechnika Warszawska, Wydział Inżynierii Lądowej ORCID: 0000-0002-9099-9457

 wojciech.trochymiak@pw.edu.pl