The use of BIM in construction scheduling


Vol. 526 (6) 2016 / sobota, 27 października, 2018

(in Polish)

Krzysztof Gawron,
Łukasz Radzik,
Krzysztof Schabowicz

DOI: 10.15199/33.2016.06.07

Volume 526; Issue 6
Pages 17-19

Accepted for publication: 12.04.2016 r.

Schedules of works made in programs such as Microsoft Project have certain limitations, that affect on possibility of their correct analysis. The article demonstrates the use of BIM technology in scheduling works. Schematic diagram of the procedure for creating a 4D construction model was presented. Example simulation of construction was presented as well.

Keywords: BIM, schedules of construction works, 4D model.
  1. Boton Conrad, Sylvain Kubicki, Gilles Halin. 2013. „Designing adapted visualization for collaborative 4D applications”. Automation in Construction 36: 152 – 67. DOI: 10.1016/j.autcon. 2013.09.003.
  2. Bryde David, Martí Broquetas, Jürgen Marc Volm. 2013. „The project benefits of Building Information Modelling (BIM)”. International Journal of Project Management 31 (7): 971 – 80. DOI: 10.1016/j.ijproman.2012.12.001.
  3. Daniel W. Halpin, Bolivar A. Senior. 2010. Construction Management. 4 edition. Hoboken. NJ.Wiley.
  4. Eastman Chuck, Charles M. Eastman, Paul Teicholz, Rafael Sacks. 2011. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors. JohnWiley & Sons.
  5. Harmonogram. 2015. Wikipedia, wolna encyklopedia. https://pl.wikipedia.org/w/index.php? title=Harmonogram&oldid=42089221.
  6. Hejducki Zdzisław. 2015. „Zastosowanie metod sprzężeń czasowych w harmonogramowaniu zintegrowanego systemu transportu i montażu”. Konferencja Naukowa „Problemy naukowe w zarządzaniu projektami”. WSOLW. Wrocław.
  7. Hu Zhenzhong, Jianping Zhang. 2011. „BIM-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials”. Automation in Construction, Building Information Modeling and Changing Construction Practices 20 (2): 167 – 80. DOI: 10.1016/j.autcon.2010.09.014.
  8. IFC4 Documentation. 2015. http://www.buildingsmart-tech.org/ifc/IFC4/final/html/index.htm.
  9. Marcinkowski Roman. 2007. „Harmonogramowanie produkcji przedsiębiorstwa budowlanego”. Przegląd Budowlany 78: 41 – 47.
  10. Volk Rebekka, Julian Stengel, Frank Schultmann. 2014. „Building Information Modeling (BIM) for existing buildings – Literature review and future needs”. Automation in Construction 38 (3): 109 – 27. DOI: 10.1016/j.autcon.2013.10.023.
Krzysztof Gawron, Ph. D., Eng. - Wroclaw University of Technology, Faculty of Civil Engineering

Łukasz Radzik, MSc. Eng. - Wroclaw University of Technology, Faculty of Civil Engineering

Krzysztof Schabowicz, Ph. D., MSc. Eng. - Wroclaw University of Technology, Faculty of Civil Engineering

Anna Komerska, Msc., Eng.

krzysztof.gawron@pwr.edu.pl

Full paper is available at Publisher house SIGMA-NOT Sp. z o.o. webpage

DOI: 10.15199/33.2016.06.07