Damage on the pavement of bridges and on the connection of the road to the bridge


Vol. 536 (4) 2017 / poniedziałek, 22 października, 2018

(in Polish)

K. Germaniuk

DOI: 10.15199/33.2017.04.16

Volume 536: Issue 4
Pages 80-83
Accepted for publication: 03.03.2017 r.

The total length of bridges is only 0,25% of the length of the national road network. However, there are buildings whose construction cost is about 50% of the cost of building a section of the road. The cost of building a pavement on a bridge is only about 0,5% of the bridge structure cost and only 0,25% of the road building cost. However the falture of the pavement on the bridge can load to the long ruming of the section of the road of operation. Error arising when pavement works with a vollue of 0,5% of the bridge investment can generale costs equal to 20 ÷ 40% of this investment ie 40 ÷ 80 times higher. This article discusses the mechanism of the formation of the most common damage on th pavement of bridge and the connection of the road to the bridge object and na attempt was made to explain their causes.

Keywords:bridge pavement, pavement damage, pavement crack, pavement break, pavement settlement, transition slab, connection between the road and the brigde
  1. Dreier Damien, Olivier Burdet, Aurelio Muttonio. 2011. „Transition Slabs of Integral Abutment Bridges”. Structural Engineering International (2): 144 – 150.
  2. Katalog detali mostowych. Generalna Dyrekcji Dróg Krajowych i Autostrad. Transprojekt Warszawa, Warszawa, 2002/2004
  • dr inż. Krzysztof Germaniuk, Instytut Badawczy Dróg i Mostów

dr inż. Krzysztof Germaniuk

kgermaniuk@ibdim.edu.pl