A presentation of design issues concerning the construction of the Byczeń weir and a hydroelectric station at km 100+076 of the Nysa Kłodzka river. The performed analyses of the environmental conditions relating to the proposed dam, as well as those of the power station, were determined on the basis of the cost-effectiveness of the investment. Based on the flow simulation conducted in the HEC-Ras program, within the environment of GIS databases, it was determined that the impact of the step dam on surrounding areas would have the additional positive effect of stabilizing the riverbed above Byczeń. Keywords: weir, hydroelectric station, hydraulic modelling.
  1. Assessment and Mapping of the Riverine Hydrokinetic Energy Resource in the Continental United States. EPRI, Palo Alto, CA: 2012. 1026880.
  2. Pluta Małgorzata, Julita Relisko-Rybak. 2004. „Studium ochrony przed powodzią zlewni rzeki Nysy Kłodzkiej poniżej wodowskazu Bardo”. Hydrologia wielkich wód. Szczecin. Instytut Morski w Gdańsku.
  3. Popow Andrzej. 2013. Studium lokalizacyjne elektrowni wodnej. Rzeka Nysa Kłodzka, km 100+076. PPC sp. z o.o. Wrocław.
  4. Yang J., R. D. Townsend, B. Daneshfar. 2006. „Applying the HEC-RASmodel and GIS techniques in river network floodplain delineation”. Canadian Journal of Civil Engineering 33 (1): 19 – 28.
dr inż. Andrzej Popow Politechnika Wrocławska, Wydział Budownictwa Lądowego i Wodnego dr hab. inż. Stanisław Kostecki, prof. Politechnika Wrocławska, Wydział Budownictwa Lądowego i Wodnego

dr inż. Andrzej Popow Politechnika Wrocławska, Wydział Budownictwa Lądowego i Wodnego

andrzej.popow@pwr.edu.pl

Full paper is available at Publisher house SIGMA-NOT Sp. z o.o. webpage