Consequences of incorrect timing of repairs to installations in a residential building


openaccess, Vol. 607 (3) 2023 / poniedziałek, 20 marca, 2023

(Open Access)

DOI: 10.15199/33.2023.03.08

Nowogońska Beata, Nowogoński Ireneusz. 2023. Consequences of incorrect timing of repairs to installations in a residential building. Volume 607. Issue 3. Pages 35-37. Article in PDF file

Accepted for publication: 22.11.2022 r.

The repair deadlines for water, sewerage and central heating installations are often postponed, resulting in installation failures and more extensive repair work in the building. This paper presents an analysis of the effects of postponed installation repairs on changes in the technical condition of the building. The results obtained show the necessity of timely installation renovation works due to the increasing amount of construction waste and the introduced reduction of waste with increasing recycling rates.
  1. Sobotka A, Linczowski K, Radziejowska A. Substitution of Building Components in Historic Buildings Sustainability. 2021; 13 (16): 9211.
  2. Bucoń R, Czarnigowska A. Sequential Model for Long-Term Planning of Building Renewal and Capital Improvement. Sustainability. 2021; 13 (17): 9575.
  3. Hoła A, Sadowski Ł. A method of the neural identification of the moisture content in brick walls of historic buildings on the basis of non-destructive tests. Autom. Constr. 2019; 106, 102850.
  4.  Drozd W. Metody oceny stanu technicznego budynków w aspekcie ich praktycznego zastosowania. Przegląd Budowlany. 2017; 88.
  5. Leśniak A, Górka M, Skrzypczak I. 2021. Barriers to BIM Implementation in Architecture, Construction, and Engineering Projects – The Polish Study. Energies. 2021; 14 (8): 2090.
  6. Plebankiewicz E, Meszek W, Zima K, Wieczorek D. Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings under Conditions of Exposure to Risk. Sustainability. 2019; 12: 226.
  7. Konior J, Sawicki M, Szóstak M. Damage and Technical Wear of Tenement Houses in Fuzzy Set Categories. Applied Sciences. 2021; 11 (4): 1484.
  8.  Rusek J. Creating a model of technical wear of building in mining area, with utilization of regressive SVM approach. Archives of Mining Sciences. 2009; 54 (3): 455 – 466.
  9. Skrzypczak I, Oleniacz G, Leśniak A, Zima K, Mrówczyńska M, Kazak J. Scan-to-BIM method in construction: assessment of the 3D buildings model accuracy in terms inventory measurements. Building Research & Information. 2022; 202: 1 – 22.
  10. Rusek J, Tajduś K, Firek K, Jędrzejczyk A. Score-based Bayesian belief network structure learning in damage risk modelling of mining areas building development. Journal of Cleaner Production. 2021; 296: 126528.
  11. Ksit B, Szymczak-Graczyk A, Nazarewicz B. Diagnostics and renovation of moisture affected historic buildings. Civil Environmental Engineering Reports. 2022, 32: 0059 – 0073.
  12. Młyńska A, Zielina M, Bielski A. Contamination of drinking water soon after cement mortar lining renovation depending on the disinfectant doses. SN Applied Sciences. 2019; 1 (6): 1 – 9.
  13. Nowogońska B, Nowogoński I. Method of Planning Repairs of the Installation including Building Waste Applied Sciences. 2022; 12 (9): 4520.
  14.  Pawluk K. Odzysk i recykling z odpadów z branży budowlanej. Logistyka Odzysku. 2016; 21: 62 – 65.
  15. Nowogońska B. Diagnoza w procesie starzenia budynków mieszkalnych wykonanych w technologii tradycyjnej. Wyd. KILiW PAN, Warszawa 2017.
  16. Nowogońska B. 2017.Metoda przewidywania stanu technicznego budynku mieszkalnego. Materiały Budowlane. 2017.DOI: 10.15199/33.2017.08.36.
dr hab. inż. Beata Nowogońska, prof UZ, Uniwersytet Zielonogórski, Instytut Budownictwa ORCID: 0000-0001-6343-4840
dr inż. Ireneusz Nowogoński, Uniwersytet Zielonogórski, Instytut Inżynierii Środowiska ORCID: 0000-0002-7372-1103

dr hab. inż. Beata Nowogońska, prof UZ, Uniwersytet Zielonogórski, Instytut Budownictwa ORCID: 0000-0001-6343-4840

b.nowogonska@ib.uz.zgora.pl

Full paper:

DOI: 10.15199/33.2023.03.08

Article in PDF file