Majkowski Łukasz, Pasławski Jerzy. 2022. Flexible Formwork Flow 4.0 – improvement of formwork management on site in accordance with the principles of Industry 4.0. Volume 604. Issue 12. Pages 67-72. Article in PDF file
Accepted for publication: 10.10.2022 r.
As a result of studies, the concept 3F4 has been supplemented by a new geolocation system and real-time monitoring. At the same time, it should be remembered that the current cost outlays are constantly changing and are constantly updated in the 3F4 system. Thanks to the introduction of Lean and/orAgile methodologies, we can be sure that the construction works in a way that ensures the stabilization of construction processes and the possibility of adapting to the following changes.Although these two concepts require taking other steps towards achieving different goals, the proper combination of them, taking into account classic methods and the idea of Industry 4.0, allows, as a result, to achieve a synergy effect – improvement the analyzed process.
- Prieto R. 2021. Construction – 4.0. National Academy of ConstructionExecutive Insights. 2021; https://www. researchgate. net/publication/ 348690890_Construction-40 dnia 30.07.2022.
- Hossan MA, Nadeem A. Towards Digitizing the Construction Industry: State of theArt of Construction 4.0; Proceedings of International Structural Engineering and Construction. 2019.
- Stehn L, Höök M. Lean principles in industrialized housing production: The need for a cultural change. Lean Construction Journal. 2008: 2 – 7, pobrano z Internetu: https://www. researchgate. net/figure/The-house-of-lean- -production-in-the-context-of-the-literature-review-representing-a-lean_fig1_ 228433776.
- KristowskiA,Majkowski Ł. Organizacja badań poligonowych budowy wybranych systemów deskowań – zeszyty naukowe Politechniki Rzeszowskiej Nr 276; Budownictwo i Inżynieria Środowiska. 2011; 58 (3/11/III): 241 – 248.
- Thomas HR, Horman MJ, de Souza UEL, Zavrski I. Reducing variability to improve performance as a lean construction principle, Journal of Construction Engineering and Management. 2002; 128: 144 – 154.
- Martinez E, Tommelein ID,AlvearA. Formwork system selection using choosing by advantages. In Construction Research Congress. San Juan, Puerto Rico. 2016: 1700 – 1709.
- Forcael E, Ferrari I, Opazo-Vega A, Pulido-Arcas JA. Construction 4.0: A Literature Review, Sustainability. 2020; 12 (22): 19 – 22.
- Thomas HR. Schedule Acceleration, Work Flow, and Labor Productivity. Journal of Construction Engineering Management. 2000; 126: 261 – 267.
- HannaAS, SenouciAB. NEUROSLAB – neural network system for horizontal formwork selection. Canadian Journal of Civil Engineering. 1995; 22 (4): 785 – 792.
mgr inż. Łukasz Majkowski, PERI Polska Sp. z o.o. Oddział Poznań
ORCID: 0000-0002-4575-8638
dr hab. inż. Jerzy Pasławski, prof. PP, Politechnika Poznańska, Wydział Inyżnierii Lądowej i Transportu ORCID: 0000-0002-5570-2363
dr hab. inż. Jerzy Pasławski, prof. PP, Politechnika Poznańska, Wydział Inyżnierii Lądowej i Transportu ORCID: 0000-0002-5570-2363
mgr inż. Łukasz Majkowski, PERI Polska Sp. z o.o. Oddział Poznań ORCID: 0000-0002-4575-8638